NITTO KOHKI HB-15B 5/8 in. Electric Hand Beveler
★★★★★No reviews yet
Categories: , Welding Positioners & Welding Tables, Uncategorized
Description Ideal for plate, pipe and tube beveling for welding preparation Bevels angles 15° to 45° Bevels approximately 3′ to 4′ per minute High speed cutting action minimizes material hardening ACCESSORIES INCLUDED: 4mm Allen Wrench 5mm Allen Wrench 6mm Allen Wrench Hook Spanner 25-28 Spanner 24mm x 27mm 3mm T Wrench Roller Bracket Assembly 2 Sets of Cutting tips, comes with one set mounted (12 pieces/set) SPECIFICATIONS: Power Supply: 115V AC, 50/60 Hz Rated Power Consumption: 910 W Rated Current: 10.5 A No Load Speed: 3,340 RPM Chamfering Capacity (Mild Steel): 5/8″ (15mm) Depth at 45° Angle Chamfer Angle: 15° – 45° Power Cord: 13.1 feet (4 meters) Weight: 33 lbs. CHAMFER ANGLE AND WIDTH: Chamfer angle HB-15B Mild Steel (mm) X Y 45° 15 30° 9 15.5 15° 4 15.4 Specifications are subject to change without notice. NOTE: Data is provided by the manufacturer. WARRANTY: 1 YEAR – Limited OPTIONAL ITEMS: CALL FOR PRICE TA9A093: Premium grade cutting tips (12 pcs./set) TA9A728: Pipe and Tube Beveling Attachment Capacity 7-7/8″ to 32″ inches O.D.
SHIPPING TIMES:
– 2D Products (Posters, Prints, Stickers, etc.)
Standard: 5 – 10 Business Days
Expedited: 3 – 5 Business Days
– 3D Products & Dropshipping Items
Standard: 25 – 35 Business Days
Processing and manufacturing times may vary depending on demand and supplier production schedules.
Because it's a high-quality product, meticulous attention to detail is required during the manufacturing process.
SHIPPING COST:
– Standard Shipping ()
- Orders using this option generally arrive 5-10 days (U.S. orders) and it takes 2 weeks for International orders after being manufactured and shipped. (See notes below)
- Manufacturing times for this option vary more around busier times of the year or during extreme circumstances such as covid-19 shutdowns.
– Shipping and expedited manufacturing () (U.S. Only)
- Orders using this option jump to the front of the manufacturing queue which can generally save a couple days (or more during busier times of the year).
- It’s highly recommended to use this option if you are ordering for a specific event or holiday.
- Orders using this option generally arrive 2-3 days after being manufactured and shipped. (U.S. only)
- Orders using expedited manufacturing will be printed when the next batch of orders are processed which can vary depending on seasonality and other factors.
Please Note:
- We do not guarantee shipping or arrival dates.
- Manufacturing during the majority of the year takes between 1-5 business days (Mon-Fri) however can take more than a week during the heaviest shopping times of the year. Extreme circumstances such as covid-19 may delay order manufacturing and/or shipping by an additional week or more.
- All manufacturing and shipping times mentioned are just estimates and will vary.
- Some of our popular designs may be pre-printed and may ship out faster than less commonly ordered designs/style/color combinations.
- Our shirts are made when ordered. Due to the time variability of on-demand manufacturing, we offer 2 options for how quickly you want to receive your order. You can select from the following choices in checkout.

