BIRMINGHAM V-412-6 4 ft x 12 ga. Manual Box and Pan Brake
★★★★★No reviews yet
Categories: , Welding Positioners & Welding Tables, Uncategorized
Description SPECIFICATIONS: Bending Capacity Bending Length: 48″ Mild steel: 12 ga Stainless steel: 16 ga Standard Finger Assortment (width & number of fingers) 3″: 3 4″: 2 5″: 5 6″: 1 Bending angle: 0-135° Beam adjustment: 1″ Min. reverse bend: 5/16″ Packing size, inch: 71″ x 34″ x 44″ Net weight, lbs: 2,300 Specifications are subject to change without notice. NOTE: Data is provided by the manufacturer. WARRANTY: 1 YEAR – Parts
SHIPPING TIMES:
– 2D Products (Posters, Prints, Stickers, etc.)
Standard: 5 – 10 Business Days
Expedited: 3 – 5 Business Days
– 3D Products & Dropshipping Items
Standard: 25 – 35 Business Days
Processing and manufacturing times may vary depending on demand and supplier production schedules.
Because it's a high-quality product, meticulous attention to detail is required during the manufacturing process.
SHIPPING COST:
– Standard Shipping ()
- Orders using this option generally arrive 5-10 days (U.S. orders) and it takes 2 weeks for International orders after being manufactured and shipped. (See notes below)
- Manufacturing times for this option vary more around busier times of the year or during extreme circumstances such as covid-19 shutdowns.
– Shipping and expedited manufacturing () (U.S. Only)
- Orders using this option jump to the front of the manufacturing queue which can generally save a couple days (or more during busier times of the year).
- It’s highly recommended to use this option if you are ordering for a specific event or holiday.
- Orders using this option generally arrive 2-3 days after being manufactured and shipped. (U.S. only)
- Orders using expedited manufacturing will be printed when the next batch of orders are processed which can vary depending on seasonality and other factors.
Please Note:
- We do not guarantee shipping or arrival dates.
- Manufacturing during the majority of the year takes between 1-5 business days (Mon-Fri) however can take more than a week during the heaviest shopping times of the year. Extreme circumstances such as covid-19 may delay order manufacturing and/or shipping by an additional week or more.
- All manufacturing and shipping times mentioned are just estimates and will vary.
- Some of our popular designs may be pre-printed and may ship out faster than less commonly ordered designs/style/color combinations.
- Our shirts are made when ordered. Due to the time variability of on-demand manufacturing, we offer 2 options for how quickly you want to receive your order. You can select from the following choices in checkout.

