NITTO KOHKI EJC-32A JET CHISEL Electric Needle Scaler
★★★★★No reviews yet
Categories: , Ultrasonics & Accessories, Federal
Description Overload protection Powerful 300 watt double insulated motor Extended length, slim barrel design Adjustable front handle for operator comfort and convenience ACCESSORIES INCLUDED: 15 pieces of 3 mm × 180 mm Needles 6mm Allen Wrench SPECIFICATIONS: Power Supply 115V AC, 50/60 Hz 230V AC, 50/60 Hz Rated Power Consumption 300 watts Rated Current 2.8A 1.4A Rated Duty Cycle 30 minutes Stroke per Minute 3,000 SPM Standard Needles with Machine 15 pieces of 3 mm x 180 mm Optional Needle Size 32 pieces of 2 mm x 180 mm Power Cord Length 6-1/2 feet (5 meters) Weight 9.9 lbs. (4.5 kg) Specifications are subject to change without notice. NOTE: Data is provided by the manufacturer. WARRANTY: 1 YEAR – Limited OPTIONAL ITEMS: CALL FOR PRICE Optional Needles: Premium Nitto Kohki needles out-perform competitors’ needles ensuring optimal performance and trouble-free operation. Anti-sparking beryllium copper and stainless steel needles available upon request. Consult factory before ordering. TP16475: Needle Supporter 2mm TP16301: Needle Supporter 3mm TA98780: Needle 2mm x 150mm (100pcs./set) TA98781: Needle 2mm x 180mm (100pcs./set) TA98782: Needle 3mm x 180mm (100pcs./set)
SHIPPING TIMES:
– 2D Products (Posters, Prints, Stickers, etc.)
Standard: 5 – 10 Business Days
Expedited: 3 – 5 Business Days
– 3D Products & Dropshipping Items
Standard: 25 – 35 Business Days
Processing and manufacturing times may vary depending on demand and supplier production schedules.
Because it's a high-quality product, meticulous attention to detail is required during the manufacturing process.
SHIPPING COST:
– Standard Shipping ()
- Orders using this option generally arrive 5-10 days (U.S. orders) and it takes 2 weeks for International orders after being manufactured and shipped. (See notes below)
- Manufacturing times for this option vary more around busier times of the year or during extreme circumstances such as covid-19 shutdowns.
– Shipping and expedited manufacturing () (U.S. Only)
- Orders using this option jump to the front of the manufacturing queue which can generally save a couple days (or more during busier times of the year).
- It’s highly recommended to use this option if you are ordering for a specific event or holiday.
- Orders using this option generally arrive 2-3 days after being manufactured and shipped. (U.S. only)
- Orders using expedited manufacturing will be printed when the next batch of orders are processed which can vary depending on seasonality and other factors.
Please Note:
- We do not guarantee shipping or arrival dates.
- Manufacturing during the majority of the year takes between 1-5 business days (Mon-Fri) however can take more than a week during the heaviest shopping times of the year. Extreme circumstances such as covid-19 may delay order manufacturing and/or shipping by an additional week or more.
- All manufacturing and shipping times mentioned are just estimates and will vary.
- Some of our popular designs may be pre-printed and may ship out faster than less commonly ordered designs/style/color combinations.
- Our shirts are made when ordered. Due to the time variability of on-demand manufacturing, we offer 2 options for how quickly you want to receive your order. You can select from the following choices in checkout.
Related products
Sale!

