BAILEIGH LF-20 20 ga. Lock Former Pittsburgh Machine
★★★★★No reviews yet
Categories: , Welding Positioners & Welding Tables, Uncategorized
Description HVAC shops demand a lot out of their equipment, so when Baileigh Industrial developed the LF-20 Pittsburgh machine, they knew it had to be able to last. The LF-20 Pittsburgh machine is made from only the highest quality components which include an all steel forming head and hardened with ground shafts. The steel forming rolls on this Pittsburgh machine are case hardened using matching cut gears and needle bearings throughout for years of use and abuse. Running on 220 volt single phase power the Baileigh Industrial LF-20 is great for making Pittsburgh joints on sheet metal up to 20 gauge . Using approximately 1″ of material for each lock, the LF-20 has pocket depth ranges from 5/16″ to 3/8″, so material waste is kept to a minimum. The LF-20 lock former from Baileigh Industrial also has other attachments available, each creating a unique joint. These optional attachments are double seam, drive cleat, flange attachment, and right angle. This do it all is a must in any shop. SPECIFICATIONS: Capacity (mid steel): 20 ga. Depth of Pocket (adjustable): .314″ up to .375″ Speed: 25 feet/min Motor: 1 HP Power Requirement: 220V / 1-phase Shipping Dimensions (L/W/H): 48″ x 45″ x 48″ Shipping Weight: 410 lbs Specifications are subject to change without notice. NOTE: Data is provided by the manufacturer. WARRANTY: 1 YEAR – Parts
SHIPPING TIMES:
– 2D Products (Posters, Prints, Stickers, etc.)
Standard: 5 – 10 Business Days
Expedited: 3 – 5 Business Days
– 3D Products & Dropshipping Items
Standard: 25 – 35 Business Days
Processing and manufacturing times may vary depending on demand and supplier production schedules.
Because it's a high-quality product, meticulous attention to detail is required during the manufacturing process.
SHIPPING COST:
– Standard Shipping ()
- Orders using this option generally arrive 5-10 days (U.S. orders) and it takes 2 weeks for International orders after being manufactured and shipped. (See notes below)
- Manufacturing times for this option vary more around busier times of the year or during extreme circumstances such as covid-19 shutdowns.
– Shipping and expedited manufacturing () (U.S. Only)
- Orders using this option jump to the front of the manufacturing queue which can generally save a couple days (or more during busier times of the year).
- It’s highly recommended to use this option if you are ordering for a specific event or holiday.
- Orders using this option generally arrive 2-3 days after being manufactured and shipped. (U.S. only)
- Orders using expedited manufacturing will be printed when the next batch of orders are processed which can vary depending on seasonality and other factors.
Please Note:
- We do not guarantee shipping or arrival dates.
- Manufacturing during the majority of the year takes between 1-5 business days (Mon-Fri) however can take more than a week during the heaviest shopping times of the year. Extreme circumstances such as covid-19 may delay order manufacturing and/or shipping by an additional week or more.
- All manufacturing and shipping times mentioned are just estimates and will vary.
- Some of our popular designs may be pre-printed and may ship out faster than less commonly ordered designs/style/color combinations.
- Our shirts are made when ordered. Due to the time variability of on-demand manufacturing, we offer 2 options for how quickly you want to receive your order. You can select from the following choices in checkout.

