BAILEIGH Deep Throat Shrinker Stretcher MSS-18DT
★★★★★No reviews yet
Categories: , Eşarp & Şal, Tumbler Holders
Description BAILEIGH 18 gauge Deep Throat Shrinker Stretcher MSS-18DT Every shop needs a shrinker stretcher at one time or another, but all of the economical ones on the market suffer from the same issue, throat depth. Baileigh decided to take a look at that problem and tackle it head on. Presenting the MSS-18DT deep throat shinker stretcher. This little workhorse feature a 2.5″ throat depth instead of the industry standard 1.5″. Whats better it comes with 2-heads to save time. No need to switch jaws! 18 gauge mild steel and 16 gauge aluminum capacity. 2.5” throat provides that little extra depth for even more versatility lets you work on the edges of panels. Comes assembled with shrinker and stretcher jaws—everything you need to get started. Jaws are in separate iron housings, so you don’t have to change tooling between functions. Heavy cast iron construction allows the shrinker stretcher to reliably work at full capacity over many years of use. Covered by a 1-year parts warranty and lifetime technical support by phone. Replacement jaws and other parts in stock, so they can ship them to you quickly. Recommended for: Entry-level sheet metal shaping, especially in automotive and airplane shops. Note: Square corner jaws on this model can leave small indents that require additional smoothing. For a shrinker stretcher without square corner jaws, check out the MSS-16F. ITEM: 18 ga Deep Throat Shrinker Stretcher MANUFACTURER: BAILEIGH MODEL: MSS-18DT Item/Model: BAILEIGH MSS-18DT
SHIPPING TIMES:
– 2D Products (Posters, Prints, Stickers, etc.)
Standard: 5 – 10 Business Days
Expedited: 3 – 5 Business Days
– 3D Products & Dropshipping Items
Standard: 25 – 35 Business Days
Processing and manufacturing times may vary depending on demand and supplier production schedules.
Because it's a high-quality product, meticulous attention to detail is required during the manufacturing process.
SHIPPING COST:
– Standard Shipping ()
- Orders using this option generally arrive 5-10 days (U.S. orders) and it takes 2 weeks for International orders after being manufactured and shipped. (See notes below)
- Manufacturing times for this option vary more around busier times of the year or during extreme circumstances such as covid-19 shutdowns.
– Shipping and expedited manufacturing () (U.S. Only)
- Orders using this option jump to the front of the manufacturing queue which can generally save a couple days (or more during busier times of the year).
- It’s highly recommended to use this option if you are ordering for a specific event or holiday.
- Orders using this option generally arrive 2-3 days after being manufactured and shipped. (U.S. only)
- Orders using expedited manufacturing will be printed when the next batch of orders are processed which can vary depending on seasonality and other factors.
Please Note:
- We do not guarantee shipping or arrival dates.
- Manufacturing during the majority of the year takes between 1-5 business days (Mon-Fri) however can take more than a week during the heaviest shopping times of the year. Extreme circumstances such as covid-19 may delay order manufacturing and/or shipping by an additional week or more.
- All manufacturing and shipping times mentioned are just estimates and will vary.
- Some of our popular designs may be pre-printed and may ship out faster than less commonly ordered designs/style/color combinations.
- Our shirts are made when ordered. Due to the time variability of on-demand manufacturing, we offer 2 options for how quickly you want to receive your order. You can select from the following choices in checkout.

