METALpro MP9000 12 Ton Hydraulic Tube and Pipe Bender
★★★★★No reviews yet
Categories: , Logos And Brands, Fragrances
Description The METALpro MP9000 Bender can be used on a variety of professional, farm, and industrial production jobs. With different dies, the machine can bend ½” through 2″ sch. 40 and 80 pipe up to 90º. The same dies can also be used to bend solid rod and rigid electrical conduit up to 90º. Dies for ½” to 2″ heavy wall round tubing are available. Contact us for specific requirements. The most cost effective 90 degree bender on the market Wide range of bending applications Bends up to 90º sch. 40 and sch. 80 pipe For use with solid rod Bend rigid electrical conduit Bend heavy wall tubing Works at any shop or job site with 110V, 20 amp service One year warranty Made in the Hamilton, MI USA SPECIFICATIONS: Capacity: 12 US Tons Speed: 2 strokes/min Strokes per minute: approximately 4-5 for smallest pipe Size range: 1/2″ up to 2″ diameter Maximum bend: 90° Motor: 1-1/2 horsepower Electrical: 110V, 20 amp Hydraulic power: Self-contained, 2500 PSI Hydraulic oil capacity: 1.5 gallon Width: 26 in. Height: 43 in. Length: 27 in. Weight: 250 lbs. OPTIONAL ITEMS: Round Pipe Dies (See photos) Round Tube Dies (See photos) For full accessories list see photo gallery
SHIPPING TIMES:
– 2D Products (Posters, Prints, Stickers, etc.)
Standard: 5 – 10 Business Days
Expedited: 3 – 5 Business Days
– 3D Products & Dropshipping Items
Standard: 25 – 35 Business Days
Processing and manufacturing times may vary depending on demand and supplier production schedules.
Because it's a high-quality product, meticulous attention to detail is required during the manufacturing process.
SHIPPING COST:
– Standard Shipping ()
- Orders using this option generally arrive 5-10 days (U.S. orders) and it takes 2 weeks for International orders after being manufactured and shipped. (See notes below)
- Manufacturing times for this option vary more around busier times of the year or during extreme circumstances such as covid-19 shutdowns.
– Shipping and expedited manufacturing () (U.S. Only)
- Orders using this option jump to the front of the manufacturing queue which can generally save a couple days (or more during busier times of the year).
- It’s highly recommended to use this option if you are ordering for a specific event or holiday.
- Orders using this option generally arrive 2-3 days after being manufactured and shipped. (U.S. only)
- Orders using expedited manufacturing will be printed when the next batch of orders are processed which can vary depending on seasonality and other factors.
Please Note:
- We do not guarantee shipping or arrival dates.
- Manufacturing during the majority of the year takes between 1-5 business days (Mon-Fri) however can take more than a week during the heaviest shopping times of the year. Extreme circumstances such as covid-19 may delay order manufacturing and/or shipping by an additional week or more.
- All manufacturing and shipping times mentioned are just estimates and will vary.
- Some of our popular designs may be pre-printed and may ship out faster than less commonly ordered designs/style/color combinations.
- Our shirts are made when ordered. Due to the time variability of on-demand manufacturing, we offer 2 options for how quickly you want to receive your order. You can select from the following choices in checkout.

