BURR KING M85 VibraKING 8.5 cu. ft. Vibratory Chamber – Options Available
★★★★★No reviews yet
Categories: , Eşarp & Şal, Tumbler Holders
Description MADE IN USA Vibratory Chambers that deliver quiet, high performance Deburring, Polishing, Descaling and surface conditioning Optional process timers may be added to the M25, M45, and M85. These timers permit precise process timing control to manage critical finishes and economize valuable shop time. Process timers include high quality magnetic starter contactors. Capacity 2.5, 4.5 and 8.5 cubic feet Ultra quiet High energy, fast process results Patented drive and isolation Portable Integrated, metered, compound delivery system Flow-through design Accepts Filter PAK 4001 Replaceable drain NEMA, UL, CSA, Listed electricals Integrated process timer and/or magnetic starter option Amplitude fully adjustable Bronze caged, sealed long life bearings Rugged welded steel construction Heavy 85 duro urethane liner 5/8″ thick Integrated discharge chute Compact footprint friendly to “cell” manufacturing OSHA complaint, enclosed guarding All Vibra King chambers accept one to four dividers Any Burr King tub or bowl can be used wet or dry *Includes magnetic starter (NEMA 12) and controls without power cord. ** This may vary substantially according to part shapes, material, process times, etc. NOTE: ALWAYS WEAR PROTECTIVE EYE, FACE, ARM, LEG AND BODY GEAR WHEN USING ANY GRINDER, POLISHER, BUFFER OR OTHER ROTATING MACHINERY. STANDARD EQUIPMENT: Improved replaceable drains (Models 25, 45, 85): Quick to change Minimizes drain clogging Easy to reach Extends tub life Economical Standard on all VibraKING tubs SPECIFICATIONS – VibraKING with Hush Design – GENERAL DATA MODEL M85 Length max. (in.): 48 Width max. (in.): 36 Height max. (in.): 45 Total volume cu. ft.: 8.5 Working volume cu. ft.: 7.2 Tub width, inside (in.): 20 Tub length, inside (in.): 37 Tub depth, inside (in.): 20 Max. part length (in.): 36 Media load (lbs.): 450 Part load (lbs.) *: 450 Weight max. lbs. (empty): 675 Horse power, standard: 3.0 (3PH) SPECIFICATIONS SKU # MODEL Timer Ship WT. (lbs.) HZ HP MAG. Starter Volt/Phase 85103 85 No 750 60 3 Yes 220/3* 85303 Yes 765 220/3 SPECIFICATIONS – VibraKING CHAMBERS COMBI PAKS SKU # MODEL Filter PAK 4001 Sound Damping Lid Timer Ship WT. (lbs.) HZ HP MAG. Starter Volt/Phase 85123 85 No Yes No 915 60 3 Yes 220/3* 85323 Yes 930 220/3 *Includes magnetic starter (NEMA 12) and controls without power cord. Specifications are subject to change without notice. NOTE: Data is provided by the manufacturer. WARRANTY: 1 YEAR – Limited OPTIONAL MODELS: 85103: M85 3 HP 220V/3 PHASE Mag. Starter = $17,105.00 85303: M85 3 HP 220V/3 PHASE Timer Mag. Starter = $17,894.00 85123: M85 Sound Damping Lid Mag. Starter 3 HP 220V/3 PHASE = $21,214.00 85323: M85 Sound Damping Lid Timer Mag. Starter 3 HP 220V/3 PHASE = $22,002.00
SHIPPING TIMES:
– 2D Products (Posters, Prints, Stickers, etc.)
Standard: 5 – 10 Business Days
Expedited: 3 – 5 Business Days
– 3D Products & Dropshipping Items
Standard: 25 – 35 Business Days
Processing and manufacturing times may vary depending on demand and supplier production schedules.
Because it's a high-quality product, meticulous attention to detail is required during the manufacturing process.
SHIPPING COST:
– Standard Shipping ()
- Orders using this option generally arrive 5-10 days (U.S. orders) and it takes 2 weeks for International orders after being manufactured and shipped. (See notes below)
- Manufacturing times for this option vary more around busier times of the year or during extreme circumstances such as covid-19 shutdowns.
– Shipping and expedited manufacturing () (U.S. Only)
- Orders using this option jump to the front of the manufacturing queue which can generally save a couple days (or more during busier times of the year).
- It’s highly recommended to use this option if you are ordering for a specific event or holiday.
- Orders using this option generally arrive 2-3 days after being manufactured and shipped. (U.S. only)
- Orders using expedited manufacturing will be printed when the next batch of orders are processed which can vary depending on seasonality and other factors.
Please Note:
- We do not guarantee shipping or arrival dates.
- Manufacturing during the majority of the year takes between 1-5 business days (Mon-Fri) however can take more than a week during the heaviest shopping times of the year. Extreme circumstances such as covid-19 may delay order manufacturing and/or shipping by an additional week or more.
- All manufacturing and shipping times mentioned are just estimates and will vary.
- Some of our popular designs may be pre-printed and may ship out faster than less commonly ordered designs/style/color combinations.
- Our shirts are made when ordered. Due to the time variability of on-demand manufacturing, we offer 2 options for how quickly you want to receive your order. You can select from the following choices in checkout.
Related products
Sale!

