Description Method: These stranded colorwork socks are knit from the cuff down, featuring a modified Eye of Partridge heel flap and gusset decreases placed on the sole. This top-down triangular sole decrease method was developed by Marianne at Running Yarn and is used here in it’s original version with her kind permission. These socks can be knitted on dpns, by magic loop, or on a short circular (in which case you will still need dpns for the heel and toe decreases). Please note the colorwork design in this pattern is charted not written out. You need to be prepared to read and work from charts in order to enjoy knitting this design. Size: Foot circumference 8” (20.5 cm) Ladies UK 5-8. Although these socks are written for one size this is adjustable to a certain degree. Firstly, to increase or decrease the foot circumference you can change the needle size (and therefore the tension) that you knit these socks at. Please note stranded colorwork does not have the same stretch to it that a plain stocking stitch sock does. Secondly, to increase the leg and/or foot length you can work more plain MC rounds before or after knitting the charts, or between pattern bands. You can also repeat motifs from the charts (e.g., work an extra band of fishes). Similarly, the leg and/or foot length can be decreased by working fewer plain rounds between the bands of motifs or by removing a pattern band completely. Please bear in mind that any changes to size or tension will affect the amount of yarn required to knit these socks. Yarn: You can use any 4 ply (fingering) sock yarn with which you can get gauge. You will need at least two contrasting colors of yarn, but this is a great pattern to experiment with color! You might choose to use three colors as I have done to highlight the little boats in the pair shown, you might choose to add a contrast color just for the cuffs, heels, and toes; you could even use a totally different color for each pattern band to use mini skeins or leftovers from your stash! Be creative, have fun, but keep in mind changes will affect yardage and the number of ends to weave in. Please note I do not recommend using yarns with a high cotton content as cotton doesn’t stretch as much as other fibers and this will affect the fit of your socks. The amounts of each color required will depend on how many colors you pick and where you choose to use them in the sock. As a guide for the three color socks shown: MC – Approx. 240 metres, 263 yards CC1 – Approx. 120 metres, 132 yards CC2 – Approx. 10 metres, 11 yards Needles: 3mm dpns 2.5mm dpns / short circular or size needed for gauge/fit. Other Materials: 4 Stitch Markers Tape Measure Scissors Darning needle to sew in ends. Like this:Like Loading...
SHIPPING TIMES:
– 2D Products (Posters, Prints, Stickers, etc.)
Standard: 5 – 10 Business Days
Expedited: 3 – 5 Business Days
– 3D Products & Dropshipping Items
Standard: 25 – 35 Business Days
Processing and manufacturing times may vary depending on demand and supplier production schedules.
Because it's a high-quality product, meticulous attention to detail is required during the manufacturing process.
SHIPPING COST:
– Standard Shipping ()
- Orders using this option generally arrive 5-10 days (U.S. orders) and it takes 2 weeks for International orders after being manufactured and shipped. (See notes below)
- Manufacturing times for this option vary more around busier times of the year or during extreme circumstances such as covid-19 shutdowns.
– Shipping and expedited manufacturing () (U.S. Only)
- Orders using this option jump to the front of the manufacturing queue which can generally save a couple days (or more during busier times of the year).
- It’s highly recommended to use this option if you are ordering for a specific event or holiday.
- Orders using this option generally arrive 2-3 days after being manufactured and shipped. (U.S. only)
- Orders using expedited manufacturing will be printed when the next batch of orders are processed which can vary depending on seasonality and other factors.
Please Note:
- We do not guarantee shipping or arrival dates.
- Manufacturing during the majority of the year takes between 1-5 business days (Mon-Fri) however can take more than a week during the heaviest shopping times of the year. Extreme circumstances such as covid-19 may delay order manufacturing and/or shipping by an additional week or more.
- All manufacturing and shipping times mentioned are just estimates and will vary.
- Some of our popular designs may be pre-printed and may ship out faster than less commonly ordered designs/style/color combinations.
- Our shirts are made when ordered. Due to the time variability of on-demand manufacturing, we offer 2 options for how quickly you want to receive your order. You can select from the following choices in checkout.

