– Large fit raglan sleeve bomber jacket made by Stighlorgan’s brand new London factory – Features a custom made Core D7 outershell with a large fit – Lined with organic cotton poplin – Heavy duty triple layer fabric is complimented by taped vital seams Micah is Stighlorgan’s take on the perfect performance bomber jacket. We opted for a voluminous Helter Skelter style silhouette with generous torso and arms tunnels. Taking this style of bomber to a level of performance that will see you through the winter, we’ve used extra heavy duty CoreD7 poly canvas for the main shell. Micah has the classic chunky cotton ribbed collar but we decided to finish the cuffs with buttons instead of rib for a different less puffy, more angular cuff effect. The sleeves are in a raglan format so extend from the neck seam, across the shoulder and down to the cuffs. The raglan sleeve allows for that recognisable large scale fit on the shoulders and chest. Lining is a contrast ecru colour and we concealed the inner pocket with a turned and stitched mini zip that sits between the inner zip facing and lining panels. The chunky Derlin zip has 2 zip runners so that the jacket can unzip upwards, ideal for use on a bike, and features our trademark zip tape pull. Materials: Materials are what we do best and are what make the jackets in our collection truly unique. We have used all the same heavy-duty fabrics that been developed specifically for our bags and luggage. Nobody else has tried making jackets from fabric as thick and heavy duty and the end result is a jacket that feels uniquely crisp and solid. This is a year-round jacket suited to both winter and spring weather so we used a breathable organic cotton lining.
SHIPPING TIMES:
– 2D Products (Posters, Prints, Stickers, etc.)
Standard: 5 – 10 Business Days
Expedited: 3 – 5 Business Days
– 3D Products & Dropshipping Items
Standard: 25 – 35 Business Days
Processing and manufacturing times may vary depending on demand and supplier production schedules.
Because it's a high-quality product, meticulous attention to detail is required during the manufacturing process.
SHIPPING COST:
– Standard Shipping ()
- Orders using this option generally arrive 5-10 days (U.S. orders) and it takes 2 weeks for International orders after being manufactured and shipped. (See notes below)
- Manufacturing times for this option vary more around busier times of the year or during extreme circumstances such as covid-19 shutdowns.
– Shipping and expedited manufacturing () (U.S. Only)
- Orders using this option jump to the front of the manufacturing queue which can generally save a couple days (or more during busier times of the year).
- It’s highly recommended to use this option if you are ordering for a specific event or holiday.
- Orders using this option generally arrive 2-3 days after being manufactured and shipped. (U.S. only)
- Orders using expedited manufacturing will be printed when the next batch of orders are processed which can vary depending on seasonality and other factors.
Please Note:
- We do not guarantee shipping or arrival dates.
- Manufacturing during the majority of the year takes between 1-5 business days (Mon-Fri) however can take more than a week during the heaviest shopping times of the year. Extreme circumstances such as covid-19 may delay order manufacturing and/or shipping by an additional week or more.
- All manufacturing and shipping times mentioned are just estimates and will vary.
- Some of our popular designs may be pre-printed and may ship out faster than less commonly ordered designs/style/color combinations.
- Our shirts are made when ordered. Due to the time variability of on-demand manufacturing, we offer 2 options for how quickly you want to receive your order. You can select from the following choices in checkout.

